•
Course Details •
Registration Fees
Full Fee for 1 - RM2695.00
Group fee for 3 or more*
RM2395.00
(
MIN SAVINGS OF RM900 )
* Terms and
conditions apply.
|
Organised
by
|
|
A
2-day intensive course on
STORAGE
TANKS
21 - 22 April 2008 n
JW
Marriott Hotel, Kuala Lumpur
|
n
Design Considerations
n
Construction, Erection and Commissioning
n
Inspection & Maintenance
n
Testing and Repairs
|
COURSE
HIGHLIGHTS:
|
•
|
Basic
Design Concepts |
•
|
Types
Of Storage Tanks |
•
|
Construction
And Erection Of Typical Aboveground Storage Tank |
•
|
Operations |
|
* Operating
Principles |
|
* Operating
Problems |
|
-
Foaming |
|
-
Leaks And Repairs |
|
-
Corrosion |
|
-
Vent Associated Problems |
|
-
Spillage Control And Environment Protection |
•
|
Maintenance,
Repair And Troubleshooting |
|
* Bottom
Plate Thickness Inspection And Analysis |
|
* Tank
Verticality |
|
* Leak
Test |
|
* Sludge
Removal And Tank Cleaning |
|
* Sludge
Treatment And Disposal |
WHO
SHOULD ATTEND
• Consulting
Engineers • Maintenance Engineers •
Project Engineers
• Maintenance Superintendents •
Maintenance Personnel
• Service Engineers • Operations,
Maintenance and Instrumentation Leadmen •
Plant Operators • Chargemen •
Technical Assistants
• Technical Co-ordinators• Operation
& Maintenance Personnel
• Technicians • New/Trainee
Engineers • Contractors
COURSE
LEADER
ROBERTO MARAVILLA,
BS in Mech Eng., was acting Consultant to Petronas & Qatar Petroleum
on Pipelines & Piping System and Mechanical Equipment Management.
|
|