•
Course Details •
Registration Fees
Full Fee for 1 - RM3095.00
Group fee for 3 or more* RM2695.00
( MIN SAVINGS OF RM1200 )
* Terms and
conditions apply.
|
Organised
by
|
|
A 3-day intensive course on
Storage Tanks
• Design Considerations
• Construction, Erection and Commissioning
• Inspection & Maintenance
• Testing and Repairs
• LNG Tanks
19-21 November 2008 • JW Marriott Hotel, Kuala Lumpur
|
|
COURSE HIGHLIGHTS
|
• |
Basic Design Concepts |
• |
Types Of Storage Tanks |
• |
Construction And Erection Of Typical Aboveground Storage Tank |
• |
Operations |
|
* Operating Principles
* Operating Problems
- Foaming - Leaks And Repairs
- Corrosion - Vent Associated Problems
- Spillage Control And Environment Protection |
• |
Maintenance, Repair And Troubleshooting |
|
* Bottom Plate Thickness Inspection And Analysis
* Tank Verticality
* Leak Test
* Sludge Removal And Tank Cleaning
* Sludge Treatment And Disposal |
• |
LNG Tanks |
|
* Introduction to LNG Tanks
* Analysis of LNG tank
* Safety |
WHO SHOULD ATTEND
• Consulting Engineers
• Maintenance Engineers
• Project Engineers
• Maintenance Superintendents
• Maintenance Personnel
• Service Engineers
• Plant Operators• Operations, Maintenance and Instrumentation Leadmen
• Chargemen
• Technical Assistants
• Technical Co-ordinators • Contractors
• Operation & Maintenance Personnel
• Technicians
• New/Trainee Engineers
COURSE
LEADER
ROBERTO MARAVILLA, BS in Mech Eng., was acting Consultant to Petronas & Qatar Petroleum on Pipelines & Piping System and Mechanical Equipment Management.
|
|